Hyatt Industrial Landfill

Back to Service
Back to Service
Hyatt Industrial Landfill

TriAD conducted a Hydrogeologic Investigation and prepared associated permit documents for this expansion of an industrial landfill. The combined vertical and horizontal expansion of the existing facility provided Magotteaux Corporation with an additional 44 years of operating landfill life. Due to the inert nature of the wastes generated at the facility, TriAD was able to obtain waivers from the required liner and leachate collection system typically required for Class II landfills. Included with the permit application were the Hydrogeologic Report, Engineering Drawings, Operations Manual, Construction Quality Assurance Plan, Closure/Post-Closure Care Plan, Groundwater Monitoring Plan, and Design Calculations.

TriAD Environmental Consultants
(615) 889-6888
207 Donelson Pike Ste 200
Nashville, TN 37214