Sanders Industrial Landfill

Back to Service
Back to Service
Back to Service
Back to Service
Sanders Industrial Landfill

TriAD prepared landfill expansion and construction plans for this private industrial landfill, permitted for the disposal of non-hazardous industrial wastes produced at their adjacent secondary lead smelter. Subsequent to permitting and construction plan development, TriAD provided on-site personnel to perform quality assurance/quality control monitoring during landfill construction. Coordination with Alabama Department of Environmental Management personnel during construction was vital to expeditiously facilitate permit approval for field changes implemented during construction. Storm water monitoring of site sediment basins and constructed sediment control structures was also conducted throughout construction to prevent the transport of any construction sediment to the adjacent, on-site wetlands.

TriAD Environmental Consultants
(615) 889-6888
207 Donelson Pike Ste 200
Nashville, TN 37214