Valley Packaging Corporation

Back to Service
Back to Service
Valley Packaging Corporation

Prior industrial activity at this site included a copper tube manufacturing operation that released petroleum and metals to the environment. TriAD designed and implemented Phase I and II Remediation Plans designed to define the full nature and extent of the contamination, including soil test pits, direct-push soil sampling, and groundwater monitoring well installation and sampling. The presence of low concentrations of volatile organic compounds in site soil and groundwater, while initially raising concerns, was demonstrated to be associated with the released petroleum products and not indicative of a separate source of contamination. TriAD designed and implemented a site remediation that combined bioremediation with groundwater pump-and-treat, resulting in a no-further-action decision from the Tennessee Division of Solid Waste Management.

TriAD Environmental Consultants
(615) 889-6888
207 Donelson Pike Ste 200
Nashville, TN 37214